Topzle Topzle

Yellow Line (Namma Metro)

Updated: Wikipedia source

Yellow Line (Namma Metro)

The Yellow Line is a line on the Namma Metro rail system. As of 2025, the line is 19.15 km (11.90 mi) long, connecting Rashtreeya Vidyalaya Road with Bommasandra, and is fully elevated with 16 stations. The line interchanges with the Green Line at Rashtreeya Vidyalaya Road, and has two upcoming interchanges with the Pink Line at Jayadeva Hospital and the Blue Line at Central Silk Board. The Yellow Line was officially inaugurated on 10 August 2025 by the Prime Minister Narendra Modi, with the line opening for public use on the following day. The line currently operates with five trainsets at 15-minute headways during peak hours and 4 trainsets at 19-minute headways during non-peak hours . The sixth trainset arrived at Hebbagodi depot on 2nd December 2025, after its induction, The line will operate with six trainsets at 12-minute headways during peak hours and 5 trainsets at 15-minute headways during non-peak hours Further trainsets are to be introduced by March 2026, when full operations are expected with 15 trainsets and a headway of 5-6 minutes.

Infobox

Other names
mw- .inline, .inline dl, .inline ol, .inline ul, dl dl, dl ol, dl ul, ol dl, ol ol dd dd dd , dd dt , dd li , dt dd , dt dt , dt li , li dd dd dd , dd dt , dd li , dt dd , dt dt , dt li , li dd dd ol li Rashtreeya Vidyalaya Road–Bommasandra LineLine 3Electronic City Line
Native name
ಹಳದಿ ಮಾರ್ಗ (Haḷadi mārga)
Status
Operational
Owner
Bangalore Metro Rail Corporation Limited (BMRCL)
Locale
Bengaluru, Karnataka, India
Termini
mw- Rashtreeya Vidyalaya RoadDelta Electronics Bommasandra
Connecting lines
Operational (1):Green LineUpcoming (2):Pink Line Blue Line
Stations
16
Website
bmrc.co.in
Type
Metro
System
Namma Metro
Depot(s)
Hebbagodi
Rolling stock
Titagarh Rail Systems
Opened
10 August 2025; 4 months ago (10 August 2025)
Line length
19.15 km (11.90 mi)
Number of tracks
2
Character
Elevated
Track gauge
1,435 mm (.mw- 4 ft 8 1⁄2 in) standard gauge
Electrification
750 V DC third rail
Signalling
CBTC Signalling System
Yellow Line map
Yellow Line map html } } Legend Green Line towards Madavara Rashtreeya Vidyalaya Road Green Line Green Line towards Silk Institute Ragigudda Jayadeva Hospital Pink LineUnder construction BTM Layout Central Silk Board Blue LineUnder construction Bommanahalli Hongasandra Kudlu Gate Singasandra Hosa Road Beratena Agrahara Electronic City Infosys Foundation Konappana Agrahara Huskur Road Biocon Hebbagodi Hebbagodi Depot Delta Electronics Bommasandra

Tables

· Planning › Bidding <sup>[<i><span>citation needed</span></i>]</sup>
Tendering
Tendering
Pre Construction Activity & Civil Work
Tendering
Pre Construction Activity & Civil Work
Section
Pre Construction Activity & Civil Work
Length
Pre Construction Activity & Civil Work
Successful bid/cost
Pre Construction Activity & Civil Work
Contractor
Pre Construction Activity & Civil Work
Award
Reach-5/2016/Demolition/DLN-3RT
Reach-5/2016/Demolition/DLN-3RT
Pre Construction Activity & Civil Work
Reach-5/2016/Demolition/DLN-3RT
Pre Construction Activity & Civil Work
RV Road to Hongasandra
Pre Construction Activity & Civil Work
₹3.64 crore (US$430,000)
Pre Construction Activity & Civil Work
B R Chawla Demolition
Pre Construction Activity & Civil Work
23 Feb 2016
Reach-5/2015/ Demolition/DLN-4
Reach-5/2015/ Demolition/DLN-4
Pre Construction Activity & Civil Work
Reach-5/2015/ Demolition/DLN-4
Pre Construction Activity & Civil Work
Hongasandra to Bommasandra
Pre Construction Activity & Civil Work
₹3.82 crore (US$450,000)
Pre Construction Activity & Civil Work
B R Chawla Demolition
Pre Construction Activity & Civil Work
25 Jan 2016
Reach 5/P1/Via & Stn/2016/12
Reach 5/P1/Via & Stn/2016/12
Pre Construction Activity & Civil Work
Reach 5/P1/Via & Stn/2016/12
Pre Construction Activity & Civil Work
Bommasandra to Hosa Road
Pre Construction Activity & Civil Work
6.418 km (3.988 mi)
Pre Construction Activity & Civil Work
₹485.52 crore (US$57 million)
Pre Construction Activity & Civil Work
ITD-ITD Cem JV
Pre Construction Activity & Civil Work
25 Mar 2017
Reach 5/P2/Via & Stn/2016/13
Reach 5/P2/Via & Stn/2016/13
Pre Construction Activity & Civil Work
Reach 5/P2/Via & Stn/2016/13
Pre Construction Activity & Civil Work
Hosa Road to Bommanahalli
Pre Construction Activity & Civil Work
6.385 km (3.967 mi)
Pre Construction Activity & Civil Work
₹511.35 crore (US$60 million)
Pre Construction Activity & Civil Work
ITD-ITD Cem JV
Pre Construction Activity & Civil Work
25 Apr 2017
Reach 5/P3/Via & Stn/2016/18
Reach 5/P3/Via & Stn/2016/18
Pre Construction Activity & Civil Work
Reach 5/P3/Via & Stn/2016/18
Pre Construction Activity & Civil Work
Bommanahalli to RV Road
Pre Construction Activity & Civil Work
6.340 km (3.939 mi)
Pre Construction Activity & Civil Work
₹797.29 crore (US$94 million)
Pre Construction Activity & Civil Work
HCC-URC JV
Pre Construction Activity & Civil Work
16 May 2017
Total
Total
Pre Construction Activity & Civil Work
Total
Pre Construction Activity & Civil Work
19.143 km (11.895 mi)
Pre Construction Activity & Civil Work
₹1,801.62 crore (US$210 million)
Architectural Finishing Works
Architectural Finishing Works
Pre Construction Activity & Civil Work
Architectural Finishing Works
Package
Package
Pre Construction Activity & Civil Work
Package
Pre Construction Activity & Civil Work
Section
Pre Construction Activity & Civil Work
Successful bid/cost
Pre Construction Activity & Civil Work
Contractor
Pre Construction Activity & Civil Work
Award
R5(P1&P2)/Arch.Works/STN/2020/64
R5(P1&P2)/Arch.Works/STN/2020/64
Pre Construction Activity & Civil Work
R5(P1&P2)/Arch.Works/STN/2020/64
Pre Construction Activity & Civil Work
Bommanahalli to Bommasandra
Pre Construction Activity & Civil Work
₹92.89 crore (US$11 million)
Pre Construction Activity & Civil Work
Godrej & Boyce
Pre Construction Activity & Civil Work
02 Nov 2020
R5(P3)/Arch.Works/STN/2021/80
R5(P3)/Arch.Works/STN/2021/80
Pre Construction Activity & Civil Work
R5(P3)/Arch.Works/STN/2021/80
Pre Construction Activity & Civil Work
RV Road to Central Silk Board
Pre Construction Activity & Civil Work
₹67.13 crore (US$7.9 million)
Pre Construction Activity & Civil Work
MR Constructions
Pre Construction Activity & Civil Work
05 Jan 2022
Total
Total
Pre Construction Activity & Civil Work
Total
Pre Construction Activity & Civil Work
₹160.02 crore (US$19 million)
Miscellaneous
Miscellaneous
Pre Construction Activity & Civil Work
Miscellaneous
Package
Package
Pre Construction Activity & Civil Work
Package
Pre Construction Activity & Civil Work
Contract
Pre Construction Activity & Civil Work
Successful bid/cost
Pre Construction Activity & Civil Work
Contractor
Pre Construction Activity & Civil Work
Award
Land Acquisition
Land Acquisition
Pre Construction Activity & Civil Work
Land Acquisition
Pre Construction Activity & Civil Work
₹1,843 crore (US$220 million)
Pre Construction Activity & Civil Work
N/A
Pre Construction Activity & Civil Work
2017
Phase-2/ICB No. 1RS-C
Phase-2/ICB No. 1RS-C
Pre Construction Activity & Civil Work
Phase-2/ICB No. 1RS-C
Pre Construction Activity & Civil Work
UTO Consultancy
Pre Construction Activity & Civil Work
₹1.94 crore (US$230,000)
Pre Construction Activity & Civil Work
Systra – Systra MVA
Pre Construction Activity & Civil Work
17 Dec 2020
Reach 5/Hebbagodi Depot/2019/43
Reach 5/Hebbagodi Depot/2019/43
Pre Construction Activity & Civil Work
Reach 5/Hebbagodi Depot/2019/43
Pre Construction Activity & Civil Work
Hebbagodi Depot
Pre Construction Activity & Civil Work
₹170.00 crore (US$20 million)
Pre Construction Activity & Civil Work
Parnika Commercial & Estates
Pre Construction Activity & Civil Work
28 July 2019
Horti Hebbagodi/RT01/2025/127
Horti Hebbagodi/RT01/2025/127
Pre Construction Activity & Civil Work
Horti Hebbagodi/RT01/2025/127
Pre Construction Activity & Civil Work
Hebbagodi Depot finishing works
Pre Construction Activity & Civil Work
₹0.47 crore (US$56,000)
Pre Construction Activity & Civil Work
Chaithra Sourabha
Pre Construction Activity & Civil Work
3 June 2025
Phase-II/ ICB No. 8 S&T-DM
Phase-II/ ICB No. 8 S&T-DM
Pre Construction Activity & Civil Work
Phase-II/ ICB No. 8 S&T-DM
Pre Construction Activity & Civil Work
CBTC signalling
Pre Construction Activity & Civil Work
₹247.71 crore (US$29 million)
Pre Construction Activity & Civil Work
Siemens
Pre Construction Activity & Civil Work
02 Dec 2019
Phase-2/ICB No. 4 RS-DM
Phase-2/ICB No. 4 RS-DM
Pre Construction Activity & Civil Work
Phase-2/ICB No. 4 RS-DM
Pre Construction Activity & Civil Work
Rolling stock (90 Coaches)
Pre Construction Activity & Civil Work
₹657.90 crore (US$78 million)
Pre Construction Activity & Civil Work
CRRC - Titagarh
Pre Construction Activity & Civil Work
20 Feb 2020
5RS-DM
5RS-DM
Pre Construction Activity & Civil Work
5RS-DM
Pre Construction Activity & Civil Work
Rolling stock (36 Coaches)
Pre Construction Activity & Civil Work
₹414 crore (US$49 million)
Pre Construction Activity & Civil Work
BEML
Pre Construction Activity & Civil Work
03 Dec 2025
Phase-II/E&M-3
Phase-II/E&M-3
Pre Construction Activity & Civil Work
Phase-II/E&M-3
Pre Construction Activity & Civil Work
Electrical and Mechanical
Pre Construction Activity & Civil Work
₹85.78 crore (US$10 million)
Pre Construction Activity & Civil Work
Jakson – JSC JV
Pre Construction Activity & Civil Work
07 Jan 2021
Phase-2/60E1 880 Grade Rails/RT01/2020/68
Phase-2/60E1 880 Grade Rails/RT01/2020/68
Pre Construction Activity & Civil Work
Phase-2/60E1 880 Grade Rails/RT01/2020/68
Pre Construction Activity & Civil Work
Track Work
Pre Construction Activity & Civil Work
₹17.98 crore (US$2.1 million)
Pre Construction Activity & Civil Work
Jindal Steel
Pre Construction Activity & Civil Work
12 Jan 2021
Phase II/ICB No. 4 ELEV-DM
Phase II/ICB No. 4 ELEV-DM
Pre Construction Activity & Civil Work
Phase II/ICB No. 4 ELEV-DM
Pre Construction Activity & Civil Work
Elevators
Pre Construction Activity & Civil Work
₹17.83 crore (US$2.1 million)
Pre Construction Activity & Civil Work
Johnson Lifts
Pre Construction Activity & Civil Work
03 Feb 2021
Phase II/ICB No.EP4-CC
Phase II/ICB No.EP4-CC
Pre Construction Activity & Civil Work
Phase II/ICB No.EP4-CC
Pre Construction Activity & Civil Work
750V DC Third Rail electrification
Pre Construction Activity & Civil Work
₹146.88 crore (US$17 million)
Pre Construction Activity & Civil Work
Linxon India
Pre Construction Activity & Civil Work
06 Feb 2021
Phase II/ICB No.7 ESCAL - DM
Phase II/ICB No.7 ESCAL - DM
Pre Construction Activity & Civil Work
Phase II/ICB No.7 ESCAL - DM
Pre Construction Activity & Civil Work
Elevated Station Escalators
Pre Construction Activity & Civil Work
₹85.75 crore (US$10 million)
Pre Construction Activity & Civil Work
Schindler India
Pre Construction Activity & Civil Work
2 June 2021
Reach-5/Median Safety Grills/2023/100
Reach-5/Median Safety Grills/2023/100
Pre Construction Activity & Civil Work
Reach-5/Median Safety Grills/2023/100
Pre Construction Activity & Civil Work
Fabrication and Installation of Median Safety Grills
Pre Construction Activity & Civil Work
₹4.53 crore (US$540,000)
Pre Construction Activity & Civil Work
Srinivas Construction
Pre Construction Activity & Civil Work
28 Feb 2024
O&M/HR/HKS/R5/2023/1
O&M/HR/HKS/R5/2023/1
Pre Construction Activity & Civil Work
O&M/HR/HKS/R5/2023/1
Pre Construction Activity & Civil Work
Housekeeping, Services, Supply of Machinery
Pre Construction Activity & Civil Work
₹22.16 crore (US$2.6 million)
Pre Construction Activity & Civil Work
Civic International Social Service
Pre Construction Activity & Civil Work
20 Aug 2024
Phase-2/Reach-5/Road Work/2025/128
Phase-2/Reach-5/Road Work/2025/128
Pre Construction Activity & Civil Work
Phase-2/Reach-5/Road Work/2025/128
Pre Construction Activity & Civil Work
Road Works
Pre Construction Activity & Civil Work
₹7.80 crore (US$920,000)
Pre Construction Activity & Civil Work
ANU Constructions
Pre Construction Activity & Civil Work
2 May 2025
Total
Total
Pre Construction Activity & Civil Work
Total
Pre Construction Activity & Civil Work
₹3,723.73 crore (US$440 million)
Total line cost
Total line cost
Pre Construction Activity & Civil Work
Total line cost
Pre Construction Activity & Civil Work
₹5,685.37 crore (US$670 million)
Pre Construction Activity & Civil Work
Tendering
Section
Length
Successful bid/cost
Contractor
Award
Reach-5/2016/Demolition/DLN-3RT
RV Road to Hongasandra
crore (US$430,000)
B R Chawla Demolition
23 Feb 2016
Reach-5/2015/ Demolition/DLN-4
Hongasandra to Bommasandra
crore (US$450,000)
B R Chawla Demolition
25 Jan 2016
Reach 5/P1/Via & Stn/2016/12
Bommasandra to Hosa Road
6.418 km (3.988 mi)
crore (US$57 million)
ITD-ITD Cem JV
25 Mar 2017
Reach 5/P2/Via & Stn/2016/13
Hosa Road to Bommanahalli
6.385 km (3.967 mi)
crore (US$60 million)
ITD-ITD Cem JV
25 Apr 2017
Reach 5/P3/Via & Stn/2016/18
Bommanahalli to RV Road
6.340 km (3.939 mi)
crore (US$94 million)
HCC-URC JV
16 May 2017
Total
19.143 km (11.895 mi)
crore (US$210 million)
Architectural Finishing Works
Package
Section
Successful bid/cost
Contractor
Award
R5(P1&P2)/Arch.Works/STN/2020/64
Bommanahalli to Bommasandra
crore (US$11 million)
Godrej & Boyce
02 Nov 2020
R5(P3)/Arch.Works/STN/2021/80
RV Road to Central Silk Board
crore (US$7.9 million)
MR Constructions
05 Jan 2022
Total
crore (US$19 million)
Miscellaneous
Package
Contract
Successful bid/cost
Contractor
Award
Land Acquisition
₹1,843 crore (US$220 million)
N/A
2017
Phase-2/ICB No. 1RS-C
UTO Consultancy
crore (US$230,000)
Systra – Systra MVA
17 Dec 2020
Reach 5/Hebbagodi Depot/2019/43
Hebbagodi Depot
crore (US$20 million)
Parnika Commercial & Estates
28 July 2019
Horti Hebbagodi/RT01/2025/127
Hebbagodi Depot finishing works
crore (US$56,000)
Chaithra Sourabha
3 June 2025
Phase-II/ ICB No. 8 S&T-DM
CBTC signalling
crore (US$29 million)
Siemens
02 Dec 2019
Phase-2/ICB No. 4 RS-DM
Rolling stock (90 Coaches)
crore (US$78 million)
CRRC - Titagarh
20 Feb 2020
5RS-DM
Rolling stock (36 Coaches)
₹414 crore (US$49 million)
BEML
03 Dec 2025
Phase-II/E&M-3
Electrical and Mechanical
crore (US$10 million)
Jakson – JSC JV
07 Jan 2021
Phase-2/60E1 880 Grade Rails/RT01/2020/68
Track Work
crore (US$2.1 million)
Jindal Steel
12 Jan 2021
Phase II/ICB No. 4 ELEV-DM
Elevators
crore (US$2.1 million)
Johnson Lifts
03 Feb 2021
Phase II/ICB No.EP4-CC
750V DC Third Rail electrification
crore (US$17 million)
Linxon India
06 Feb 2021
Phase II/ICB No.7 ESCAL - DM
Elevated Station Escalators
crore (US$10 million)
Schindler India
2 June 2021
Reach-5/Median Safety Grills/2023/100
Fabrication and Installation of Median Safety Grills
crore (US$540,000)
Srinivas Construction
28 Feb 2024
O&M/HR/HKS/R5/2023/1
Housekeeping, Services, Supply of Machinery
crore (US$2.6 million)
Civic International Social Service
20 Aug 2024
Phase-2/Reach-5/Road Work/2025/128
Road Works
crore (US$920,000)
ANU Constructions
2 May 2025
Total
crore (US$440 million)
Total line cost
crore (US$670 million)
· Stations › Interchanges
#
#
Yellow Line
#
Yellow Line
Station name
Yellow Line
Opening
Yellow Line
Connections
Yellow Line
Station type
Yellow Line
Platform type
English
English
Yellow Line
English
Yellow Line
Kannada
1
1
Yellow Line
1
Yellow Line
Rashtreeya Vidyalaya Road
Yellow Line
ರಾಷ್ಟ್ರೀಯ ವಿದ್ಯಾಲಯ ರಸ್ತೆ
Yellow Line
11 August 2025
Yellow Line
Green Line
Yellow Line
Elevated
Yellow Line
Island & Side
2
2
Yellow Line
2
Yellow Line
Ragigudda
Yellow Line
ರಾಗಿಗುಡ್ಡ
Yellow Line
11 August 2025
Yellow Line
Elevated
Yellow Line
Side
3
3
Yellow Line
3
Yellow Line
Jayadeva Hospital
Yellow Line
ಜಯದೇವ ಆಸ್ಪತ್ರೆ
Yellow Line
11 August 2025
Yellow Line
Pink Line (under construction)
Yellow Line
Elevated
Yellow Line
Side
4
4
Yellow Line
4
Yellow Line
BTM Layout
Yellow Line
ಬಿ ಟಿ ಎಂ ಬಡಾವಣೆ
Yellow Line
11 August 2025
Yellow Line
Elevated
Yellow Line
Side
5
5
Yellow Line
5
Yellow Line
Central Silk Board
Yellow Line
ಕೇಂದ್ರ ರೇಷ್ಮೆ ಮಂಡಳಿ
Yellow Line
11 August 2025
Yellow Line
Blue Line (under construction)
Yellow Line
Elevated
Yellow Line
Side
6
6
Yellow Line
6
Yellow Line
Bommanahalli
Yellow Line
ಬೊಮ್ಮನಹಳ್ಳಿ
Yellow Line
11 August 2025
Yellow Line
Elevated
Yellow Line
Side
7
7
Yellow Line
7
Yellow Line
Hongasandra
Yellow Line
ಹೊಂಗಸಂದ್ರ
Yellow Line
11 August 2025
Yellow Line
Elevated
Yellow Line
Side
8
8
Yellow Line
8
Yellow Line
Kudlu Gate
Yellow Line
ಕೂಡ್ಲು ಗೇಟ್
Yellow Line
11 August 2025
Yellow Line
Elevated
Yellow Line
Side
9
9
Yellow Line
9
Yellow Line
Singasandra
Yellow Line
ಸಿಂಗಸಂದ್ರ
Yellow Line
11 August 2025
Yellow Line
Elevated
Yellow Line
Side
10
10
Yellow Line
10
Yellow Line
Hosa Road
Yellow Line
ಹೊಸ ರಸ್ತೆ
Yellow Line
11 August 2025
Yellow Line
Elevated
Yellow Line
Side
11
11
Yellow Line
11
Yellow Line
Beratena Agrahara
Yellow Line
ಬೆರಟೇನ ಅಗ್ರಹಾರ
Yellow Line
11 August 2025
Yellow Line
Elevated
Yellow Line
Side
12
12
Yellow Line
12
Yellow Line
Electronic City
Yellow Line
ಎಲೆಕ್ಟ್ರಾನಿಕ್ ಸಿಟಿ
Yellow Line
11 August 2025
Yellow Line
Elevated
Yellow Line
Side
13
13
Yellow Line
13
Yellow Line
Infosys Foundation Konappana Agrahara
Yellow Line
ಇನ್ಫೋಸಿಸ್ ಫೌಂಡೇಷನ್ ಕೋನಪ್ಪನ ಅಗ್ರಹಾರ
Yellow Line
11 August 2025
Yellow Line
Elevated
Yellow Line
Side
14
14
Yellow Line
14
Yellow Line
Huskur Road
Yellow Line
ಹುಸ್ಕೂರು ರಸ್ತೆ
Yellow Line
11 August 2025
Yellow Line
Elevated
Yellow Line
Side
15
15
Yellow Line
15
Yellow Line
Biocon Hebbagodi
Yellow Line
ಬಯೋಕಾನ್ ಹೆಬ್ಬಗೋಡಿ
Yellow Line
11 August 2025
Yellow Line
Elevated
Yellow Line
Side
16
16
Yellow Line
16
Yellow Line
Delta Electronics Bommasandra
Yellow Line
ಡೆಲ್ಟಾ ಎಲೆಕ್ಟ್ರಾನಿಕ್ಸ್ ಬೊಮ್ಮಸಂದ್ರ
Yellow Line
11 August 2025
Yellow Line
Elevated
Yellow Line
Side
Yellow Line
#
Station name
Opening
Connections
Station type
Platform type
English
Kannada
1
Rashtreeya Vidyalaya Road
ರಾಷ್ಟ್ರೀಯ ವಿದ್ಯಾಲಯ ರಸ್ತೆ
11 August 2025
Green Line
Elevated
Island & Side
2
Ragigudda
ರಾಗಿಗುಡ್ಡ
11 August 2025
Elevated
Side
3
Jayadeva Hospital
ಜಯದೇವ ಆಸ್ಪತ್ರೆ
11 August 2025
Pink Line (under construction)
Elevated
Side
4
BTM Layout
ಬಿ ಟಿ ಎಂ ಬಡಾವಣೆ
11 August 2025
Elevated
Side
5
Central Silk Board
ಕೇಂದ್ರ ರೇಷ್ಮೆ ಮಂಡಳಿ
11 August 2025
Blue Line (under construction)
Elevated
Side
6
Bommanahalli
ಬೊಮ್ಮನಹಳ್ಳಿ
11 August 2025
Elevated
Side
7
Hongasandra
ಹೊಂಗಸಂದ್ರ
11 August 2025
Elevated
Side
8
Kudlu Gate
ಕೂಡ್ಲು ಗೇಟ್
11 August 2025
Elevated
Side
9
Singasandra
ಸಿಂಗಸಂದ್ರ
11 August 2025
Elevated
Side
10
Hosa Road
ಹೊಸ ರಸ್ತೆ
11 August 2025
Elevated
Side
11
Beratena Agrahara
ಬೆರಟೇನ ಅಗ್ರಹಾರ
11 August 2025
Elevated
Side
12
Electronic City
ಎಲೆಕ್ಟ್ರಾನಿಕ್ ಸಿಟಿ
11 August 2025
Elevated
Side
13
Infosys Foundation Konappana Agrahara
ಇನ್ಫೋಸಿಸ್ ಫೌಂಡೇಷನ್ ಕೋನಪ್ಪನ ಅಗ್ರಹಾರ
11 August 2025
Elevated
Side
14
Huskur Road
ಹುಸ್ಕೂರು ರಸ್ತೆ
11 August 2025
Elevated
Side
15
Biocon Hebbagodi
ಬಯೋಕಾನ್ ಹೆಬ್ಬಗೋಡಿ
11 August 2025
Elevated
Side
16
Delta Electronics Bommasandra
ಡೆಲ್ಟಾ ಎಲೆಕ್ಟ್ರಾನಿಕ್ಸ್ ಬೊಮ್ಮಸಂದ್ರ
11 August 2025
Elevated
Side

References

  1. bmrc.co.in/pdf/phase2/phase2forweb.pdf
  2. www.deccanchronicle.com
    https://www.deccanchronicle.com/nation/current-affairs/pm-modi-opens-yellow-line-of-bangalore-metro-rail-1896630
  3. The Hindu
    https://www.thehindu.com/news/national/pm-modi-in-bengaluru-namma-metro-yellow-line-vande-bharat-train-inauguration-august-10-2025/article69915839.ece
  4. The Hindu
    https://www.thehindu.com/news/cities/bangalore/pm-modi-inaugurates-bengaluru-namma-metro-yellow-line-august-10-2025/article69916112.ece
  5. Prajavani
    https://www.prajavani.net/district/bengaluru-city/namma-metro-yellow-line-launch-modi-siddaramaiah-dkshivakumar-3461305
  6. livemint
    https://www.livemint.com/news/pm-modi-flags-off-yellow-line-of-bangalores-namma-metro-11754803840412.html
  7. livemint
    https://www.livemint.com/news/pm-modi-flags-off-namma-metro-yellow-line-from-bengalurus-ragigudda-takes-first-ride-to-electronic-city-watch-video-11754804035497.html
  8. Curly Tales
    https://curlytales.com/india/ct-scoop/as-pm-narendra-modi-inaugurates-namma-metro-yellow-line-heres-all-about-this-new-route/
  9. The Indian Express
    https://indianexpress.com/article/cities/bangalore/pm-modi-inaugurate-bengaluru-metro-yellow-line-august-10-10166672/
  10. The Hindu
    https://www.thehindu.com/news/cities/bangalore/bengaluru-metros-yellow-line-gets-safety-clearance-from-cmrs-for-operations/article69883083.ece
  11. https://www.deccanherald.com/india/karnataka/bengaluru/namma-metro-yellow-line-frequency-to-improve-to-15-mins-5th-train
    https://www.deccanherald.com/india/karnataka/bengaluru/namma-metro-yellow-line-frequency-to-improve-to-15-mins-5th-train-on-way-to-bengaluru-3735213
  12. Financialexpress
    https://www.financialexpress.com/business/infrastructure-bengaluru-metro-phase-2-increased-by-52-to-nearly-rs-40000-crore-3568860/
  13. The Hindu
    https://www.thehindu.com/news/cities/bangalore/bmrcl-decides-against-partial-ppp-for-namma-metro-phase-2/article4361997.ece
  14. The Hindu
    https://www.thehindu.com/news/national/karnataka/union-cabinet-approves-phase-2-of-namma-metro/article5635926.ece
  15. ETtech.com
    http://tech.economictimes.indiatimes.com/news/technology/biocon-infy-to-adopt-two-metro-stations/58727080
  16. The New Indian Express
    https://www.newindianexpress.com/cities/bengaluru/2016/dec/10/metro-floats-tenders-for-electronics-city-route-1547548.html
  17. The Hindu
    http://www.thehindu.com/news/cities/bangalore/Electronics-City-inches-closer-to-being-on-metro-map/article16791346.ece
  18. The Economic Times
    http://economictimes.indiatimes.com/news/industry/transportation/railways/thai-company-itd-will-build-stations-on-e-city-line-in-bengaluru/articleshow/58606213.cms
  19. Deccan Herald
    https://www.deccanherald.com/india/karnataka/bengaluru/first-driverless-chinese-train-for-namma-metro-arrives-in-bengaluru-2893796
  20. Bangalore Mirror
    https://bangaloremirror.indiatimes.com/bangalore/others/shun-china-stun-china-beml-ready-to-cut-metro-tender-cost/articleshow/76759947.cms
  21. The order was a top up to the 5RS-DM contract signed between BMRCL and BEML on 08 Aug 2023
  22. Metro Rail News
    https://www.metrorailnews.in/first-driverless-trains-likely-to-run-on-the-namma-metros-yellow-line-by-2021/
  23. tenderb.bmrc.co.in
    https://web.archive.org/web/20200811160342/http://tenderb.bmrc.co.in/
  24. The Hindu
    https://www.thehindu.com/news/cities/bangalore/coaches-of-driverless-metro-train-to-reach-bengaluru-from-chennai-soon/article67837772.ece
  25. The New Indian Express
    https://www.newindianexpress.com/states/karnataka/2023/nov/10/1st-driverless-train-from-china-on-its-way-2631685.html
  26. Bangalore Mirror
    https://bangaloremirror.indiatimes.com/bangalore/others/chinese-rakes-for-namma-metro-soon/articleshow/104951954.cms
  27. The Hindu
    https://www.thehindu.com/news/cities/bangalore/bmrcl-officials-visit-china-to-inspect-bengaluru-metro-yellow-line-coaches/article67480595.ece
  28. The Hindu
    https://www.thehindu.com/news/cities/bangalore/finally-driverless-coaches-for-yellow-line-of-namma-metro-arrive-in-bengaluru/article67844374.ece
  29. Deccan Herald
    https://www.deccanherald.com/india/karnataka/bengaluru/namma-metros-yellow-line-to-open-with-5-6-trains-20-min-frequency-3066156
  30. The Hindu
    https://www.thehindu.com/news/cities/bangalore/commuters-frustrated-as-namma-metros-yellow-line-set-to-open-without-adequate-trains/article69893780.ece
  31. The Hindu
    https://www.thehindu.com/news/cities/bangalore/pm-modi-inaugurates-bengaluru-namma-metro-yellow-line-august-10-2025/article69916112.ece
  32. The Hindu
    https://www.thehindu.com/news/cities/bangalore/eight-years-late-bengaluru-metros-yellow-line-ready-to-run/article69910569.ece
  33. "Namma Metro Yellow Line in Bengaluru to be inaugurated by PM Modi on August 10: Check stations, cost, etc"
    https://www.thehindu.com/news/cities/bangalore/pm-modi-inaugurates-bengaluru-namma-metro-yellow-line-august-10-2025/article69916112.ece
  34. moneycontrol.com
    https://www.moneycontrol.com/news/india/bengaluru-s-electronics-city-metro-3-trains-7-stations-bmrcl-charts-august-launch-plan-13242038.html
Image
Source:
Tip: Wheel or +/− to zoom, drag to pan, Esc to close.