Pink Line (Namma Metro)

Updated: Wikipedia source

Pink Line (Namma Metro)

The Pink Line of Namma Metro is under construction and will form part of the metro rail network for the city of Bangalore, Karnataka, India. The 21.25 km (13.20 mi) line connects Kalena Agrahara station (previously named Gottigere) on Bannerghatta Road in the south with Nagawara station on Outer Ring Road in the north. The Pink Line is mostly underground (13.92 km (8.65 mi)) but also has a 6.98 km (4.34 mi) elevated section and a 0.48 km (0.30 mi) at-grade (surface) section. There are 18 stations on the line, including 12 underground and 6 elevated ones. Pink Line will have an interchange with the Purple Line at MG Road station. It will also have interchanges with the Yellow line at Jayadeva Hospital station and with the Blue Line at Nagawara. The Blue Line is under construction. The entire line is planned to open in two phases where the first phase, covering a total distance of 7.5 km stretch (Kalena Agrahara - Tavarekere), is expected to be operational around May 2026 whereas the second phase, covering the remaining distance of 13.8 km stretch (Dairy Circle - Nagawara) is expected to be operational around December 2026 (along with Phase 2A of Blue Line).

Infobox

Other names
mw- .inline, .inline dl, .inline ol, .inline ul, dl dl, dl ol, dl ul, ol dl, ol ol dd dd dd , dd dt , dd li , dt dd , dt dt , dt li , li dd dd dd , dd dt , dd li , dt dd , dt dt , dt li , li dd dd ol li Second North–South CorridorLine 4Nagawara–Kalena Agrahara Line
Native name
Nasugeṁpu mārga
Status
Under Construction
Owner
Bangalore Metro Rail Corporation Limited (BMRCL)
Locale
Bangalore, Karnataka, India
Termini
mw- NagawaraKalena Agrahara
Connecting lines
Operational (2):Purple Line Yellow LineUpcoming (3):Blue Line Red Line Orange Line Planned (1):Inner Ring Line
Stations
18
Website
bmrc.co.in
Type
Metro
System
Namma Metro
Depot(s)
Kothanur
Planned opening
Phase 1 - May 2026; 4 months' time (May 2026)Phase 2 - December 2026; 11 months' time (December 2026) (TBC)
Line length
21.25 km (13.20 mi)
Number of tracks
2
Character
Elevated, At Grade and Underground
Track gauge
1,435 mm (.mw- 4 ft 8 1⁄2 in) standard gauge
Electrification
750 V DC third rail
Pink Line Map (TBC)
mw- html } } Legend Nagawara Blue LineUnder construction Kadugundanahalli Indian Railways towards Yesvantpur Jn and Banaswadi Venkateshpura Tannery Road Pottery Town Indian Railways towards KSR Bengaluru and Krishnarajapuram Cantonment Railway Station Shivaji Nagar Mahatma Gandhi Road Purple Line National Military School Langford Town Lakkasandra Dairy Circle Red Line Phase 2 (Dec 2026) Phase 1 (Mar 2026) (TBC) Tavarekere Jayadeva Hospital Yellow Line JP Nagar 4th Phase Orange LineApproved Orange Line towards Kempapura IIMB Hulimavu Kothanur Depot (U/C) Kalena Agrahara

Tables

· History
Section
Section
History
Section
History
Planned Opening
History
Terminals
History
Length
History
Stations
Reach 6 (Elevated)
Reach 6 (Elevated)
History
Reach 6 (Elevated)
History
May 2026
History
Kalena Agrahara
History
Tavarekere
History
7.50 km (4.66 mi)
History
6
Reach 6 (UG)
Reach 6 (UG)
History
Reach 6 (UG)
History
December 2026
History
Tavarekere
History
Nagawara
History
13.76 km (8.55 mi)
History
12
Total
Total
History
Total
History
Kalena Agrahara
History
Nagawara
History
21.26 km (13.21 mi)
History
18
History
Section
Planned Opening
Terminals
Length
Stations
Reach 6 (Elevated)
May 2026
Kalena Agrahara
Tavarekere
7.50 km (4.66 mi)
6
Reach 6 (UG)
December 2026
Tavarekere
Nagawara
13.76 km (8.55 mi)
12
Total
Kalena Agrahara
Nagawara
21.26 km (13.21 mi)
18
· Tendering
Tendering
Tendering
Pre-Construction Activity
Tendering
Pre-Construction Activity
Section
Pre-Construction Activity
Activity
Pre-Construction Activity
Successful Bid /Cost
Pre-Construction Activity
Contractor
Pre-Construction Activity
Award
Reach-6/2016/Demolition/DLN-7/03
Reach-6/2016/Demolition/DLN-7/03
Pre-Construction Activity
Reach-6/2016/Demolition/DLN-7/03
Pre-Construction Activity
Kalena Agrahara to Tavarekere
Pre-Construction Activity
Demolition
Pre-Construction Activity
₹0.77 crore (US$91,000)
Pre-Construction Activity
B R Chawla Demolition
Pre-Construction Activity
13 Jul 2016
Reach-6(UG)/2017/Demolition/DLN-8/20
Reach-6(UG)/2017/Demolition/DLN-8/20
Pre-Construction Activity
Reach-6(UG)/2017/Demolition/DLN-8/20
Pre-Construction Activity
Tavarekere to Nagawara
Pre-Construction Activity
Demolition
Pre-Construction Activity
₹1.79 crore (US$210,000)
Pre-Construction Activity
B R Chawla Demolition
Pre-Construction Activity
15 May 2017
CEE-1/ELE-US/R-6/PH-II/DPO/2017-18/60
CEE-1/ELE-US/R-6/PH-II/DPO/2017-18/60
Pre-Construction Activity
CEE-1/ELE-US/R-6/PH-II/DPO/2017-18/60
Pre-Construction Activity
Gottigere Limits to Fortis Hospital
Pre-Construction Activity
Shifting of Electrical Lines
Pre-Construction Activity
₹8.75 crore (US$1.0 million)
Pre-Construction Activity
R.K Associates
Pre-Construction Activity
18 May 2018
CEE-1/ELE-US/[R-6, Ph-II]/DPO/2017-18/28
CEE-1/ELE-US/[R-6, Ph-II]/DPO/2017-18/28
Pre-Construction Activity
CEE-1/ELE-US/[R-6, Ph-II]/DPO/2017-18/28
Pre-Construction Activity
Fortis Hospital to Jayadeva Circle
Pre-Construction Activity
Shifting of Electrical Lines
Pre-Construction Activity
₹12.87 crore (US$1.5 million)
Pre-Construction Activity
Aravinda Electricals
Pre-Construction Activity
08 Sept 2017
CEE(Ele-1)/DPO/0018/R6UG/2017-18/64
CEE(Ele-1)/DPO/0018/R6UG/2017-18/64
Pre-Construction Activity
CEE(Ele-1)/DPO/0018/R6UG/2017-18/64
Pre-Construction Activity
Jayadeva Circle to Dairy Circle
Pre-Construction Activity
Shifting of Electrical Lines
Pre-Construction Activity
₹8.71 crore (US$1.0 million)
Pre-Construction Activity
Aravinda Electricals
Pre-Construction Activity
31 Oct 2017
CEE(Ele-1)/DPO/0018/R6UG/2017-18/64
CEE(Ele-1)/DPO/0018/R6UG/2017-18/64
Pre-Construction Activity
CEE(Ele-1)/DPO/0018/R6UG/2017-18/64
Pre-Construction Activity
Dairy Circle to Nagawara
Pre-Construction Activity
Shifting of Electrical Lines
Pre-Construction Activity
₹8.95 crore (US$1.1 million)
Pre-Construction Activity
Gowtham Electricals
Pre-Construction Activity
14 Jun 2018
Total
Total
Pre-Construction Activity
Total
Pre-Construction Activity
₹41.84 crore (US$4.9 million)
Civil Work
Civil Work
Pre-Construction Activity
Civil Work
Tendering
Tendering
Pre-Construction Activity
Tendering
Pre-Construction Activity
Section
Pre-Construction Activity
Length
Pre-Construction Activity
Successful Bid /Cost
Pre-Construction Activity
Contractor
Pre-Construction Activity
Award
Phase-2/Reach-6/elevated/Via &Stn/2016/17
Phase-2/Reach-6/elevated/Via &Stn/2016/17
Pre-Construction Activity
Phase-2/Reach-6/elevated/Via &Stn/2016/17
Pre-Construction Activity
Kalena Agrahara - Dairy Circle
Pre-Construction Activity
7.50 km (4.66 mi)
Pre-Construction Activity
₹578.70 crore (US$68 million)
Pre-Construction Activity
Simplex Infrastructure
Pre-Construction Activity
08 Sept 2017
Reach 6 UG Pkg-1
Reach 6 UG Pkg-1
Pre-Construction Activity
Reach 6 UG Pkg-1
Pre-Construction Activity
Dairy Circle - Langford Town
Pre-Construction Activity
3.65 km (2.27 mi)
Pre-Construction Activity
₹1,526.33 crore (US$218 million)
Pre-Construction Activity
Afcons
Pre-Construction Activity
06 Nov 2019
Reach 6 UG Pkg-2
Reach 6 UG Pkg-2
Pre-Construction Activity
Reach 6 UG Pkg-2
Pre-Construction Activity
Langford Town - Shivajinagar
Pre-Construction Activity
2.76 km (1.71 mi)
Pre-Construction Activity
₹1,329.14 crore (US$160 million)
Pre-Construction Activity
Larsen & Toubro
Pre-Construction Activity
28 Feb 2019
Reach 6 UG Pkg-3
Reach 6 UG Pkg-3
Pre-Construction Activity
Reach 6 UG Pkg-3
Pre-Construction Activity
Shivajinagar - Tannery Road
Pre-Construction Activity
2.88 km (1.79 mi)
Pre-Construction Activity
₹1,299.23 crore (US$150 million)
Pre-Construction Activity
Larsen & Toubro
Pre-Construction Activity
28 Feb 2019
Reach 6 UG Pkg-4
Reach 6 UG Pkg-4
Pre-Construction Activity
Reach 6 UG Pkg-4
Pre-Construction Activity
Tannery Road - Nagawara
Pre-Construction Activity
4.59 km (2.85 mi)
Pre-Construction Activity
₹1,771.25 crore (US$253 million)
Pre-Construction Activity
ITD-Cem
Pre-Construction Activity
06 Nov 2019
Reach-6/Elevated/Via&Stn/RC/2021/75
Reach-6/Elevated/Via&Stn/RC/2021/75
Pre-Construction Activity
Reach-6/Elevated/Via&Stn/RC/2021/75
Pre-Construction Activity
Kalena Agrahara - Dairy Circle
Pre-Construction Activity
7.50 km (4.66 mi)
Pre-Construction Activity
₹364.87 crore (US$43 million)
Pre-Construction Activity
GR Infraprojects
Pre-Construction Activity
03 Aug 2021
Note
Note
Pre-Construction Activity
Note
Pre-Construction Activity
Reach 6 Elevated contract awarded to Simplex Infrastructure was cancelled by BMRCL due to poor progress. 37% of the civil work was finished at that time of cancellation. BMRCL later invited new tenders to finish the remaining civil work, which was then awarded to GR Infraprojects.
Total
Total
Pre-Construction Activity
Total
Pre-Construction Activity
21.25 km (13.20 mi)
Pre-Construction Activity
₹6,504.94 crore (US$770 million)
TVS & E&M
TVS & E&M
Pre-Construction Activity
TVS & E&M
Tendering
Tendering
Pre-Construction Activity
Tendering
Pre-Construction Activity
Section
Pre-Construction Activity
Length
Pre-Construction Activity
Successful Bid /Cost
Pre-Construction Activity
Contractor
Pre-Construction Activity
Award
ECTVS – 01
ECTVS – 01
Pre-Construction Activity
ECTVS – 01
Pre-Construction Activity
TVS, ECS & SCADA
Pre-Construction Activity
₹202.80 crore (US$24 million)
Pre-Construction Activity
Blue Star
Pre-Construction Activity
02 Jun 2022
ECTVS – 02
ECTVS – 02
Pre-Construction Activity
ECTVS – 02
Pre-Construction Activity
TVS, ECS & SCADA
Pre-Construction Activity
₹212.84 crore (US$25 million)
Pre-Construction Activity
UMPESL
Pre-Construction Activity
06 Mar 2023
E&M-4/UG & Elev/Ph-II
E&M-4/UG & Elev/Ph-II
Pre-Construction Activity
E&M-4/UG & Elev/Ph-II
Pre-Construction Activity
Electrical & Mechanical
Pre-Construction Activity
₹186.88 crore (US$22 million)
Pre-Construction Activity
Blue Star
Pre-Construction Activity
25 May 2022
E&M-5/UG/Ph-II
E&M-5/UG/Ph-II
Pre-Construction Activity
E&M-5/UG/Ph-II
Pre-Construction Activity
Electrical & Mechanical
Pre-Construction Activity
₹185.54 crore (US$22 million)
Pre-Construction Activity
Blue Star
Pre-Construction Activity
30 Nov 2022
Total
Total
Pre-Construction Activity
Total
Pre-Construction Activity
₹788.06 crore (US$93 million)
Station Work
Station Work
Pre-Construction Activity
Station Work
Tendering
Tendering
Pre-Construction Activity
Tendering
Pre-Construction Activity
Section
Pre-Construction Activity
Length
Pre-Construction Activity
Successful Bid /Cost
Pre-Construction Activity
Contractor
Pre-Construction Activity
Award
Phase II/ICB No. 4 ELEV-DM
Phase II/ICB No. 4 ELEV-DM
Pre-Construction Activity
Phase II/ICB No. 4 ELEV-DM
Pre-Construction Activity
Elevators
Pre-Construction Activity
Kalena Agrahara to Tavarekere
Pre-Construction Activity
₹6.69 crore (US$790,000)
Pre-Construction Activity
Johnson Lifts
Pre-Construction Activity
03 Feb 2021
Phase II/ICB No.7 ESCAL - DM
Phase II/ICB No.7 ESCAL - DM
Pre-Construction Activity
Phase II/ICB No.7 ESCAL - DM
Pre-Construction Activity
Elevated Station Escalators
Pre-Construction Activity
Dairy Circle - Nagawara
Pre-Construction Activity
₹32.15 crore (US$3.8 million)
Pre-Construction Activity
Schindler India
Pre-Construction Activity
2 June 2021
Phase-II/5 ELEV-DM
Phase-II/5 ELEV-DM
Pre-Construction Activity
Phase-II/5 ELEV-DM
Pre-Construction Activity
Elevators
Pre-Construction Activity
Dairy Circle - Nagawara
Pre-Construction Activity
₹13.72 crore (US$1.6 million)
Pre-Construction Activity
Johnson Lifts
Pre-Construction Activity
19 Aug 2022
R6-Elevated/Arch. Works/STN/2022/87
R6-Elevated/Arch. Works/STN/2022/87
Pre-Construction Activity
R6-Elevated/Arch. Works/STN/2022/87
Pre-Construction Activity
Architectural Finishing Works
Pre-Construction Activity
Kalena Agrahara to Tavarekere
Pre-Construction Activity
₹54.49 crore (US$6.4 million)
Pre-Construction Activity
Mysore Light & Interiors
Pre-Construction Activity
11 Aug 2022
Bal Arch. Wks/RT01 & RT02/R6-UG/2025/124
Bal Arch. Wks/RT01 & RT02/R6-UG/2025/124
Pre-Construction Activity
Bal Arch. Wks/RT01 & RT02/R6-UG/2025/124
Pre-Construction Activity
Architectural Finishing Works
Pre-Construction Activity
Cantonment - Nagawara
Pre-Construction Activity
₹23.75 crore (US$2.8 million)
Pre-Construction Activity
DC Facility Management
Pre-Construction Activity
23 May 2025
Bal Arch. Wks/RT01 & RT02/R6-UG/2025/125
Bal Arch. Wks/RT01 & RT02/R6-UG/2025/125
Pre-Construction Activity
Bal Arch. Wks/RT01 & RT02/R6-UG/2025/125
Pre-Construction Activity
Architectural Finishing Works
Pre-Construction Activity
Dairy Circle - Shivajinagar
Pre-Construction Activity
₹27.02 crore (US$3.2 million)
Pre-Construction Activity
ANU Constructions
Pre-Construction Activity
23 May 2025
Total
Total
Pre-Construction Activity
Total
Pre-Construction Activity
₹157.82 crore (US$19 million)
Miscellaneous
Miscellaneous
Pre-Construction Activity
Miscellaneous
Tendering
Tendering
Pre-Construction Activity
Tendering
Pre-Construction Activity
Section
Pre-Construction Activity
Length
Pre-Construction Activity
Successful Bid /Cost
Pre-Construction Activity
Contractor
Pre-Construction Activity
Award
Phase II/ICB No.EP4-CC
Phase II/ICB No.EP4-CC
Pre-Construction Activity
Phase II/ICB No.EP4-CC
Pre-Construction Activity
750V DC Third Rail electrification
Pre-Construction Activity
₹164.10 crore (US$19 million)
Pre-Construction Activity
Linxon India
Pre-Construction Activity
06 Feb 2021
Reach-6/KOTHNURDEPOT/2019/58
Reach-6/KOTHNURDEPOT/2019/58
Pre-Construction Activity
Reach-6/KOTHNURDEPOT/2019/58
Pre-Construction Activity
Kothanur Depot
Pre-Construction Activity
₹150.83 crore (US$18 million)
Pre-Construction Activity
ISGEC Heavy Engineering
Pre-Construction Activity
9 July 2020
60E1 880 Grade Rails/RT01/2020/68
60E1 880 Grade Rails/RT01/2020/68
Pre-Construction Activity
60E1 880 Grade Rails/RT01/2020/68
Pre-Construction Activity
Track Work
Pre-Construction Activity
₹20.08 crore (US$2.4 million)
Pre-Construction Activity
Jindal Steel
Pre-Construction Activity
12 Jan 2021
5RS-DM
5RS-DM
Pre-Construction Activity
5RS-DM
Pre-Construction Activity
Rolling Stock (96 Coaches)
Pre-Construction Activity
₹959.04 crore (US$110 million)
Pre-Construction Activity
BEML
Pre-Construction Activity
08 Aug 2023
Rolling Stock (42 Coaches)
Rolling Stock (42 Coaches)
Pre-Construction Activity
Rolling Stock (42 Coaches)
Pre-Construction Activity
₹405.00 crore (US$48 million)
Pre-Construction Activity
BEML
Pre-Construction Activity
29 Mar 2025
S&T-DM
S&T-DM
Pre-Construction Activity
S&T-DM
Pre-Construction Activity
CBTC signaling & Platform Screen Door
Pre-Construction Activity
₹308.52 crore (US$36 million)
Pre-Construction Activity
Alstom Transport
Pre-Construction Activity
12 Jun 2024
CEE/ELE/SL/R6/PH-II/2019-20/DPO/134/231
CEE/ELE/SL/R6/PH-II/2019-20/DPO/134/231
Pre-Construction Activity
CEE/ELE/SL/R6/PH-II/2019-20/DPO/134/231
Pre-Construction Activity
LED Street Lights,Control Switches,Cables
Pre-Construction Activity
₹3.05 crore (US$360,000)
Pre-Construction Activity
Basavashree Electricals
Pre-Construction Activity
16 Sept 2019
Reach-6/Road work/2020/67
Reach-6/Road work/2020/67
Pre-Construction Activity
Reach-6/Road work/2020/67
Pre-Construction Activity
Road, Drain, Footpath development works
Pre-Construction Activity
₹8.00 crore (US$950,000)
Pre-Construction Activity
M R Pro Tech
Pre-Construction Activity
20 Nov 2020
Total
Total
Pre-Construction Activity
Total
Pre-Construction Activity
₹2,015.57 crore (US$240 million)
Total Cost
Total Cost
Pre-Construction Activity
Total Cost
Pre-Construction Activity
21.25 km (13.20 mi)
Pre-Construction Activity
₹9,508.33 crore (US$1.1 billion)
Pre-Construction Activity
Tendering
Section
Activity
Successful Bid /Cost
Contractor
Award
Reach-6/2016/Demolition/DLN-7/03
Kalena Agrahara to Tavarekere
Demolition
crore (US$91,000)
B R Chawla Demolition
13 Jul 2016
Reach-6(UG)/2017/Demolition/DLN-8/20
Tavarekere to Nagawara
Demolition
crore (US$210,000)
B R Chawla Demolition
15 May 2017
CEE-1/ELE-US/R-6/PH-II/DPO/2017-18/60
Gottigere Limits to Fortis Hospital
Shifting of Electrical Lines
crore (US$1.0 million)
R.K Associates
18 May 2018
CEE-1/ELE-US/[R-6, Ph-II]/DPO/2017-18/28
Fortis Hospital to Jayadeva Circle
Shifting of Electrical Lines
crore (US$1.5 million)
Aravinda Electricals
08 Sept 2017
CEE(Ele-1)/DPO/0018/R6UG/2017-18/64
Jayadeva Circle to Dairy Circle
Shifting of Electrical Lines
crore (US$1.0 million)
Aravinda Electricals
31 Oct 2017
CEE(Ele-1)/DPO/0018/R6UG/2017-18/64
Dairy Circle to Nagawara
Shifting of Electrical Lines
crore (US$1.1 million)
Gowtham Electricals
14 Jun 2018
Total
crore (US$4.9 million)
Civil Work
Tendering
Section
Length
Successful Bid /Cost
Contractor
Award
Phase-2/Reach-6/elevated/Via &Stn/2016/17
Kalena Agrahara - Dairy Circle
7.50 km (4.66 mi)
crore (US$68 million)
Simplex Infrastructure
08 Sept 2017
Reach 6 UG Pkg-1
Dairy Circle - Langford Town
3.65 km (2.27 mi)
crore (US$218 million)
Afcons
06 Nov 2019
Reach 6 UG Pkg-2
Langford Town - Shivajinagar
2.76 km (1.71 mi)
crore (US$160 million)
Larsen & Toubro
28 Feb 2019
Reach 6 UG Pkg-3
Shivajinagar - Tannery Road
2.88 km (1.79 mi)
crore (US$150 million)
Larsen & Toubro
28 Feb 2019
Reach 6 UG Pkg-4
Tannery Road - Nagawara
4.59 km (2.85 mi)
crore (US$253 million)
ITD-Cem
06 Nov 2019
Reach-6/Elevated/Via&Stn/RC/2021/75
Kalena Agrahara - Dairy Circle
7.50 km (4.66 mi)
crore (US$43 million)
GR Infraprojects
03 Aug 2021
Note
Reach 6 Elevated contract awarded to Simplex Infrastructure was cancelled by BMRCL due to poor progress. 37% of the civil work was finished at that time of cancellation. BMRCL later invited new tenders to finish the remaining civil work, which was then awarded to GR Infraprojects.
Total
21.25 km (13.20 mi)
crore (US$770 million)
TVS & E&M
Tendering
Section
Length
Successful Bid /Cost
Contractor
Award
ECTVS – 01
TVS, ECS & SCADA
crore (US$24 million)
Blue Star
02 Jun 2022
ECTVS – 02
TVS, ECS & SCADA
crore (US$25 million)
UMPESL
06 Mar 2023
E&M-4/UG & Elev/Ph-II
Electrical & Mechanical
crore (US$22 million)
Blue Star
25 May 2022
E&M-5/UG/Ph-II
Electrical & Mechanical
crore (US$22 million)
Blue Star
30 Nov 2022
Total
crore (US$93 million)
Station Work
Tendering
Section
Length
Successful Bid /Cost
Contractor
Award
Phase II/ICB No. 4 ELEV-DM
Elevators
Kalena Agrahara to Tavarekere
crore (US$790,000)
Johnson Lifts
03 Feb 2021
Phase II/ICB No.7 ESCAL - DM
Elevated Station Escalators
Dairy Circle - Nagawara
crore (US$3.8 million)
Schindler India
2 June 2021
Phase-II/5 ELEV-DM
Elevators
Dairy Circle - Nagawara
crore (US$1.6 million)
Johnson Lifts
19 Aug 2022
R6-Elevated/Arch. Works/STN/2022/87
Architectural Finishing Works
Kalena Agrahara to Tavarekere
crore (US$6.4 million)
Mysore Light & Interiors
11 Aug 2022
Bal Arch. Wks/RT01 & RT02/R6-UG/2025/124
Architectural Finishing Works
Cantonment - Nagawara
crore (US$2.8 million)
DC Facility Management
23 May 2025
Bal Arch. Wks/RT01 & RT02/R6-UG/2025/125
Architectural Finishing Works
Dairy Circle - Shivajinagar
crore (US$3.2 million)
ANU Constructions
23 May 2025
Total
crore (US$19 million)
Miscellaneous
Tendering
Section
Length
Successful Bid /Cost
Contractor
Award
Phase II/ICB No.EP4-CC
750V DC Third Rail electrification
crore (US$19 million)
Linxon India
06 Feb 2021
Reach-6/KOTHNURDEPOT/2019/58
Kothanur Depot
crore (US$18 million)
ISGEC Heavy Engineering
9 July 2020
60E1 880 Grade Rails/RT01/2020/68
Track Work
crore (US$2.4 million)
Jindal Steel
12 Jan 2021
5RS-DM
Rolling Stock (96 Coaches)
crore (US$110 million)
BEML
08 Aug 2023
Rolling Stock (42 Coaches)
crore (US$48 million)
BEML
29 Mar 2025
S&T-DM
CBTC signaling & Platform Screen Door
crore (US$36 million)
Alstom Transport
12 Jun 2024
CEE/ELE/SL/R6/PH-II/2019-20/DPO/134/231
LED Street Lights,Control Switches,Cables
crore (US$360,000)
Basavashree Electricals
16 Sept 2019
Reach-6/Road work/2020/67
Road, Drain, Footpath development works
crore (US$950,000)
M R Pro Tech
20 Nov 2020
Total
crore (US$240 million)
Total Cost
21.25 km (13.20 mi)
crore (US$1.1 billion)
· Stations › Interchanges
#
#
Pink Line
#
Pink Line
Station Name
Pink Line
Expected Opening
Pink Line
Connections
Pink Line
Station Layout
Pink Line
Platform Level Type
English
English
Pink Line
English
Pink Line
Kannada
1
1
Pink Line
1
Pink Line
Kalena Agrahara
Pink Line
ಕಾಳೇನ ಅಗ್ರಹಾರ
Pink Line
May 2026
Pink Line
Elevated
Pink Line
Island & Side
2
2
Pink Line
2
Pink Line
Hulimavu
Pink Line
ಹುಳಿಮಾವು
Pink Line
May 2026
Pink Line
Elevated
Pink Line
Side
3
3
Pink Line
3
Pink Line
IIMB
Pink Line
ಐ ಐ ಎಂ ಬಿ
Pink Line
May 2026
Pink Line
Elevated
Pink Line
Side
4
4
Pink Line
4
Pink Line
Jayaprakash Nagar 4th Phase
Pink Line
ಜಯಪ್ರಕಾಶ ನಗರ 4ನೇ ಹಂತ
Pink Line
May 2026
Pink Line
Orange Line (Approved)
Pink Line
Elevated
Pink Line
Island & Side
5
5
Pink Line
5
Pink Line
Jayadeva Hospital
Pink Line
ಜಯದೇವ ಆಸ್ಪತ್ರೆ
Pink Line
May 2026
Pink Line
Yellow Line
Pink Line
Elevated
Pink Line
Side
6
6
Pink Line
6
Pink Line
Tavarekere
Pink Line
ತಾವರೆಕೆರೆ
Pink Line
May 2026
Pink Line
Elevated
Pink Line
Side
7
7
Pink Line
7
Pink Line
Dairy Circle
Pink Line
ಡೈರಿ ವೃತ್ತ
Pink Line
December 2026
Pink Line
Red Line (Proposed)
Pink Line
Underground
Pink Line
Island
8
8
Pink Line
8
Pink Line
Lakkasandra
Pink Line
ಲಕ್ಕಸಂದ್ರ
Pink Line
December 2026
Pink Line
Underground
Pink Line
Island
9
9
Pink Line
9
Pink Line
Langford Town
Pink Line
ಲ್ಯಾಂಗ್ಫೋರ್ಡ್ ಟೌನ್
Pink Line
December 2026
Pink Line
Underground
Pink Line
Island
10
10
Pink Line
10
Pink Line
National Military School
Pink Line
ರಾಷ್ಟ್ರೀಯ ಸ್ಯೆನಿಕ ಶಾಲೆ
Pink Line
December 2026
Pink Line
Underground
Pink Line
Island
11
11
Pink Line
11
Pink Line
Mahatma Gandhi Road
Pink Line
ಮಹಾತ್ಮಾ ಗಾಂಧಿ ರಸ್ತೆ
Pink Line
December 2026
Pink Line
Purple Line
Pink Line
Underground
Pink Line
Island & Side
12
12
Pink Line
12
Pink Line
Shivajinagar
Pink Line
ಶಿವಾಜಿನಗರ
Pink Line
December 2026
Pink Line
Shivajinagar TTMC
Pink Line
Underground
Pink Line
Island
13
13
Pink Line
13
Pink Line
Cantonment Railway Station
Pink Line
ದಂಡು ರೈಲ್ವೇ ನಿಲ್ದಾಣ
Pink Line
December 2026
Pink Line
Bengaluru Cantt.
Pink Line
Underground
Pink Line
Island
14
14
Pink Line
14
Pink Line
Pottery Town
Pink Line
ಪಾಟರಿ ಟೌನ್
Pink Line
December 2026
Pink Line
Underground
Pink Line
Island
15
15
Pink Line
15
Pink Line
Tannery Road
Pink Line
ಟ್ಯಾನರಿ ರಸ್ತೆ
Pink Line
December 2026
Pink Line
Underground
Pink Line
Island
16
16
Pink Line
16
Pink Line
Venkateshpura
Pink Line
ವೆಂಕಟೇಶಪುರ
Pink Line
December 2026
Pink Line
Underground
Pink Line
Island
17
17
Pink Line
17
Pink Line
Kadugundanahalli
Pink Line
ಕಾಡುಗುಂಡನಹಳ್ಳಿ
Pink Line
December 2026
Pink Line
Underground
Pink Line
Island
18
18
Pink Line
18
Pink Line
Nagawara
Pink Line
ನಾಗವಾರ
Pink Line
December 2026
Pink Line
Blue Line (Under Construction)
Pink Line
Underground
Pink Line
Island & Side
Pink Line
#
Station Name
Expected Opening
Connections
Station Layout
Platform Level Type
English
Kannada
1
Kalena Agrahara
ಕಾಳೇನ ಅಗ್ರಹಾರ
May 2026
Elevated
Island & Side
2
Hulimavu
ಹುಳಿಮಾವು
May 2026
Elevated
Side
3
IIMB
ಐ ಐ ಎಂ ಬಿ
May 2026
Elevated
Side
4
Jayaprakash Nagar 4th Phase
ಜಯಪ್ರಕಾಶ ನಗರ 4ನೇ ಹಂತ
May 2026
Orange Line (Approved)
Elevated
Island & Side
5
Jayadeva Hospital
ಜಯದೇವ ಆಸ್ಪತ್ರೆ
May 2026
Yellow Line
Elevated
Side
6
Tavarekere
ತಾವರೆಕೆರೆ
May 2026
Elevated
Side
7
Dairy Circle
ಡೈರಿ ವೃತ್ತ
December 2026
Red Line (Proposed)
Underground
Island
8
Lakkasandra
ಲಕ್ಕಸಂದ್ರ
December 2026
Underground
Island
9
Langford Town
ಲ್ಯಾಂಗ್ಫೋರ್ಡ್ ಟೌನ್
December 2026
Underground
Island
10
National Military School
ರಾಷ್ಟ್ರೀಯ ಸ್ಯೆನಿಕ ಶಾಲೆ
December 2026
Underground
Island
11
Mahatma Gandhi Road
ಮಹಾತ್ಮಾ ಗಾಂಧಿ ರಸ್ತೆ
December 2026
Purple Line
Underground
Island & Side
12
Shivajinagar
ಶಿವಾಜಿನಗರ
December 2026
Shivajinagar TTMC
Underground
Island
13
Cantonment Railway Station
ದಂಡು ರೈಲ್ವೇ ನಿಲ್ದಾಣ
December 2026
Bengaluru Cantt.
Underground
Island
14
Pottery Town
ಪಾಟರಿ ಟೌನ್
December 2026
Underground
Island
15
Tannery Road
ಟ್ಯಾನರಿ ರಸ್ತೆ
December 2026
Underground
Island
16
Venkateshpura
ವೆಂಕಟೇಶಪುರ
December 2026
Underground
Island
17
Kadugundanahalli
ಕಾಡುಗುಂಡನಹಳ್ಳಿ
December 2026
Underground
Island
18
Nagawara
ನಾಗವಾರ
December 2026
Blue Line (Under Construction)
Underground
Island & Side

References

  1. The Hindu
    https://www.thehindu.com/news/national/karnataka/namma-metros-pink-line-deadline-pushed-to-2026/article69572071.ece
  2. bmrc.co.in/pdf/phase2/phase2forweb.pdf
  3. The Hindu
    http://www.thehindu.com/news/cities/bangalore/know-the-location-of-new-red-line-metro-stations/article19284362.ece
  4. News18
    https://www.news18.com/auto/bengaluru-namma-metro-pink-line-tunnel-work-to-complete-by-august-8845392.html
  5. Times Now
    https://www.timesnownews.com/bengaluru/bengaluru-namma-pink-line-set-for-2026-full-station-list-interchanges-and-key-details-inside-bengaluru-news-article-153028308
  6. Curly Tales
    https://curlytales.com/india/trending/bengaluru-metro-pink-line-when-will-the-new-line-open-key-stations-routes-all-you-need-to-know/
  7. Times Now
    https://www.timesnownews.com/bengaluru/bengaluru-metro-pink-line-namma-metro-pink-line-opening-delayed-when-will-it-finally-open-for-bengaluru-article-151633658
  8. The Hindu
    https://www.thehindu.com/news/national/karnataka/namma-metros-pink-line-deadline-pushed-to-2026/article69572071.ece
  9. Times Now
    https://www.timesnownews.com/bengaluru/bengaluru-metros-reach-6-line-likely-to-be-commissioned-in-sept-2026-see-which-areas-it-will-connect-article-151624040
  10. The Hindu
    https://www.thehindu.com/news/national/karnataka/a-walk-through-namma-metros-pink-line-tunnel/article69230667.ece
  11. The Hindu
    https://www.thehindu.com/news/national/karnataka/namma-metros-pink-line-likely-to-open-in-phases/article68484715.ece
  12. TimesNow
    https://www.timesnownews.com/bengaluru/namma-metro-phase-2-in-bengaluru-to-be-operational-by-2025-announces-karnataka-deputy-cm-dk-shivakumar-article-107571304
  13. Karnataka.com
    https://www.karnataka.com/watch/bangalore-mono-rail/
  14. "DPR Phase-2"
    https://english.bmrc.co.in/FileUploads/da2798_NewsFiles.pdf
  15. The Economic Times
    http://economictimes.indiatimes.com/industry/transportation/railways/civic-work-to-start-in-a-year-metro-phase-ii-boasts-of-most-expensive-underground-line/articleshow/59467986.cms
  16. Asianet News Network Pvt Ltd
    https://newsable.asianetnews.com/karnataka/bmrcl-will-not-construct-metro-station-near-cantonment
  17. The New Indian Express
    https://www.newindianexpress.com/cities/bengaluru/2017/jul/15/mertro-new-alignment-for-longest-underground-stretch-1628969.html
  18. Deccan Herald
    http://www.deccanherald.com/content/622905/location-proposed-cantt-metro-station.html
  19. Deccan Herald
    https://www.deccanherald.com/city/top-bengaluru-stories/bengaluru-cantonment-to-be-suburban-rail-terminal-733234.html
  20. The Economic Times
    http://economictimes.indiatimes.com/industry/transportation/railways/gottigere-nagawara-metro-line-estimated-to-cost-rs-11014-crore/articleshow/57644233.cms
  21. Dalal Street Investment Journal
    http://www.dsij.in/article-details/articleid/18925/bmrcl-to-construct-a-11-014-cr-metro-line-in-bengaluru.aspx
  22. www.tunneltalk.com
    https://www.tunneltalk.com/India-14Feb2018-Bangalore-Metro-bids-for-Phase-II-Reach-6.php
  23. The Economic Times
    https://economictimes.indiatimes.com/industry/transportation/railways/high-cost-forces-bmrcl-to-cancel-underground-tenders/articleshow/63167005.cms?from=mdr
  24. www.tunneltalk.com
    https://www.tunneltalk.com/India-21Mar2019-Bangalore-awards-first-Phase-II-underground-contracts.php
  25. Stands for Tunnel Ventilation System (TVS) and Environmental Control System (ECS).
  26. The cost for Reach-6 was averaged out from the total contract value
  27. Deccan Herald
    http://www.deccanherald.com/content/599940/tenders-called-metro-phase-2.html
  28. Bangalore Mirror
    http://bangaloremirror.indiatimes.com/bangalore/cover-story/dairy-circle-to-nagawara-metro-link-announced-but-it-wont-be-quick/articleshow/57504077.cms
  29. "Simplex Infrastructures emerge L1 Bidder in tender for Metro Rail stretch on Bannerghatta Road – RailNews Media India Ltd"
    http://www.railnews.in/simplex-infrastructures-emerge-l1-bidder-in-tender-for-metro-rail-stretch-on-bannerghatta-road/
  30. The Hindu
    https://www.thehindu.com/news/national/karnataka/namma-metro-underground-tunnel-work-on-pink-line-95-complete/article68117773.ece
  31. Deccan Herald
    https://www.deccanherald.com/india/karnataka/bengaluru/work-starts-on-bengaluru-metros-1st-platform-screen-doors-3813813
  32. Deccan Herald
    http://www.deccanherald.com/content/610576/rs-3700-cr-loan-likely.html
  33. The New Indian Express
    https://www.newindianexpress.com/cities/bengaluru/2019/jun/05/rs-2k-cr-boost-for-phase-ii-bmrcl-underground-network-1986209.html
  34. International Rail Journal
    http://www.railjournal.com/index.php/metros/india-seeks-eib-loan-for-bangalore-metro-line-4.html
  35. "Bengaluru Metro's Pink Line to be operational in two phases"
    https://www.moneycontrol.com/news/india/bengaluru-metros-pink-line-to-be-operational-in-two-phases-12784823.html#google_vignette
Image
Source:
Tip: Wheel or +/− to zoom, drag to pan, Esc to close.