Crescent Dunes Solar Energy Project

The Crescent Dunes Solar Energy Project is a solar thermal power project with an installed capacity of 110 megawatt (MW) and 1.1 gigawatt-hours of energy storage located near Tonopah, about 190 miles (310 km) northwest of Las Vegas. Crescent Dunes is the first commercial concentrated solar power (CSP) plant with a central receiver tower and advanced molten salt energy storage technology at full scale (110 MW), following the experimental Solar Two and Gemasolar in Spain at 50 MW. As of 2023, it is operated by its new owner, Vinci SA, and in a new contract with NV Energy, it now supplies solar energy at night only, drawing on thermal energy stored each day. Startup energy venture company SolarReserve (created via seed funding), US Renewables Group, and United Technologies were the original owners of Tonopah Solar Energy LLC, the owner and operator of the Crescent Dunes plant. The Crescent Dunes project was subsequently backed by a $737 million in U.S. government loan guarantees and by Tonopah partnering with Cobra Thermosolar Plants, Inc. The overall venture had a projected cost of less than $1 billion. The plant suffered several design, construction and technical problems and, having not produced power since April 2019, its sole customer, NV Energy, subsequently terminated its contract. Bloomberg reported that NV Energy was not allowed to sever its agreement with the plant until after the DoE took over the shuttered plant in August 2019. Since the initial failure of the Crescent Dunes project, SolarReserve took down its website and is believed to have permanently ceased operations. Upon the developer's silence as the involved parties sought legal recourse, the plant's exact status was publicly unknown for some time and was left to conjecture. While proceeding through its subsequent bankruptcy proceedings, Tonopah Solar Energy stated that it had hopes for a restart of the Crescent Dunes plant by the end of 2020. According to court documents, Tonopah is owned by SolarReserve, Cobra Energy Investment LLC, a division of Spanish construction company ACS Group and Banco Santander, S.A. On September 11, 2020, the bankruptcy court approved Tonopah Solar Energy's disclosure statement. On December 3, 2020, the Chapter 11 bankruptcy reorganization plan was confirmed by the court. As one result of this plan's confirmation, Cobra now has operational control of the plant. In July 2021, the project restarted production for NV Energy.

Infobox

Country
United States
Location
Tonopah, Nye County, Nevada
Coordinates
mw- 38°14′00″N 117°22′01″W / 38.2333°N 117.367°W / 38.2333; -117.367
Status
Post-bankruptcy reorganization, restart
Construction began
2011; 14 years ago (2011)
Commission date
2016; 9 years ago (2016)
Construction cost
$975 million
Owners
Tonopah Solar Energy, LLC (SolarReserve, LLC)
Operator
Vinci SA
Type
mw- CSP
CSP technology
Solar power tower
Collectors
10347 × 115.72 m2
Total collector area
296 acres (1,200,000 m2)
Site resource
2,685 kW·h/m2/yr
Site area
1,670 acres (676 ha)
Units operational
1
Make and model
Alstom
Nameplate capacity
110 MW
Capacity factor
51.9% (planned)20.3% (2018)
Annual net output
196 GW·h over 1 year (2018)
Storage capacity
1,100 MW·he
Website
Crescent Dunes
Commons
Related media on Commons

Tables

Generation (MW·h) of Crescent Dunes Solar Energy[37] · Production
2015
2015
Year
2015
Oct
1,703
Nov
1,831
Dec
0
Total
3,534
2016
2016
Year
2016
Jan
1,508
Feb
9,121
Mar
7,099
Apr
2,158
May
11,485
Jun
6,216
Jul
25,560
Aug
28,267
Sep
30,514
Oct
5,410
Nov
0
Dec
0
Total
127,338
2017
2017
Year
2017
Jan
0
Feb
0
Mar
0
Apr
0
May
0
Jun
0
Jul
9,420
Aug
9,192
Sep
13,666
Oct
9,263
Nov
488
Dec
0
Total
42,029
2018
2018
Year
2018
Jan
795
Feb
5,145
Mar
5,907
Apr
13,801
May
10,653
Jun
33,387
Jul
23,749
Aug
33,169
Sep
31,632
Oct
21,253
Nov
8,130
Dec
8,189
Total
195,810
2019
2019
Year
2019
Jan
12,889
Feb
14,431
Mar
20,041
Apr
2,807
May
Production suspended
Jun
50,168
2020
2020
Year
2020
Jan
Production suspended
Feb
0
2021
2021
Year
2021
Jan
Production suspended
Feb
3,974
Mar
15,445
Apr
20,796
May
11,929
Jun
17,489
Jul
5,088
Aug
74,721
2022
2022
Year
2022
Jan
14,635
Feb
12,238
Mar
0
Apr
0
May
0
Jun
0
Jul
0
Aug
8,852
Sep
22,166
Oct
24,710
Nov
10,590
Dec
7,475
Total
100,666
2023
2023
Year
2023
Jan
8,437
Feb
2,086
Mar
0
Apr
0
May
0
Jun
0
Jul
6,649
Aug
14,563
Sep
13,784
Oct
18,060
Nov
10,590
Dec
6,067
Total
80,236
2024
2024
Year
2024
Jan
4,556
Feb
4,122
Mar
6,448
Apr
13,516
May
20,968
Jun
26,227
Jul
18,093
Aug
19,889
Sep
18,790
Oct
9,549
Nov
5,607
Dec
6,637
Total
154,402
2025
2025
Year
2025
Jan
0
Feb
-
Mar
-
Apr
-
May
-
Jun
-
Jul
-
Aug
-
Sep
-
Oct
-
Nov
-
Dec
-
Total
-
Year
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Total
2015
1,703
1,831
0
3,534
2016
1,508
9,121
7,099
2,158
11,485
6,216
25,560
28,267
30,514
5,410
0
0
127,338
2017
0
0
0
0
0
0
9,420
9,192
13,666
9,263
488
0
42,029
2018
795
5,145
5,907
13,801
10,653
33,387
23,749
33,169
31,632
21,253
8,130
8,189
195,810
2019
12,889
14,431
20,041
2,807
Production suspended
50,168
2020
Production suspended
0
2021
Production suspended
3,974
15,445
20,796
11,929
17,489
5,088
74,721
2022
14,635
12,238
0
0
0
0
0
8,852
22,166
24,710
10,590
7,475
100,666
2023
8,437
2,086
0
0
0
0
6,649
14,563
13,784
18,060
10,590
6,067
80,236
2024
4,556
4,122
6,448
13,516
20,968
26,227
18,093
19,889
18,790
9,549
5,607
6,637
154,402
2025
0
-
-
-
-
-
-
-
-
-
-
-
-

References

  1. CleanTechnica
    http://cleantechnica.com/2016/02/22/crescent-dunes-24-hour-solar-tower-online/
  2. "VINCI completes the acquisition of ACS's energy business (Cobra IS)"
    https://www.globenewswire.com/en/news-release/2021/12/31/2359481/0/en/VINCI-completes-the-acquisition-of-ACS-s-energy-business-Cobra-IS.html
  3. Crescent Dunes Solar Energy Project, National Renewable Energy Laboratory
    https://www.nrel.gov/csp/solarpaces/project_detail.cfm/projectID=60
  4. Grupo COBRA
    https://web.archive.org/web/20160604213753/http://www.grupocobra.com/business/project/crescent-dunes-solar-thermal-power-plant/
  5. "Energy Department Finalizes $737 Million Loan Guarantee to Tonopah Solar Energy for Nevada Project"
    http://energy.gov/articles/energy-department-finalizes-737-million-loan-guarantee-tonopah-solar-energy-nevada-project
  6. "Crescent Dunes: Project Under Construction"
    https://www.energy.gov/lpo/crescent-dunes
  7. What happened with Crescent Dunes?
    https://www.solarpaces.org/what-happened-with-crescent-dunes/
  8. "US Taxpayer Backed Tonopah Solar Energy Files for Bankruptcy Protection - SWFI"
    https://www.swfinstitute.org/news/80796/us-taxpayer-backed-tonopah-solar-energy-files-for-bankruptcy-protection
  9. "DOE Races Against the Clock: Two Solar Loans Closed, Seven More to Go"
    http://www.greentechmedia.com/articles/read/doe-closes-two-solar-loans-just-before-the-deadline/
  10. www.popularmechanics.com
    https://web.archive.org/web/20210121042956/https://www.popularmechanics.com/technology/a30472835/crescent-dunes-solar-plant/
  11. www.reviewjournal.com
    https://www.reviewjournal.com/business/energy/tonopah-solar-plant-could-end-up-in-bankruptcy-developer-says-1865917/
  12. www.greentechmedia.com
    https://www.greentechmedia.com/articles/read/americas-concentrated-solar-power-companies-have-all-but-disappeared
  13. "The closure of SolarReserve, an isolated case of the concentrated solar power industry | REVE News of the wind sector in Spain and in the world"
    https://www.evwind.es/2020/02/07/the-closure-of-solarreserve-an-isolated-case-of-the-concentrated-solar-power-industry/73461
  14. Bloomberg.com
    https://www.bloomberg.com/news/articles/2020-01-06/a-1-billion-solar-plant-was-obsolete-before-it-ever-went-online
  15. "EDITORIAL: Future of Crescent Dunes solar plant near Tonopah appears bleak"
    https://www.reviewjournal.com/opinion/editorials/editorial-future-of-crescent-dunes-solar-plant-near-tonopah-appears-bleak-1866768/
  16. The Nevada Independent
    https://thenevadaindependent.com/article/nv-energy-sends-termination-notice-to-massive-tonopah-solar-project-developer-accuses-energy-department-of-taking-over
  17. "Bankrupt Solar Project Owner Hopes for Year-End Restart - Law360"
    https://www.law360.com/delaware/articles/1297268/bankrupt-solar-project-owner-hopes-for-year-end-restart
  18. "Post bankruptcy, Crescent Dunes CSP plant owner wants project back online by year's end"
    https://pv-magazine-usa.com/2020/08/03/post-bankruptcy-and-doe-loan-owner-of-crescent-dunes-wants-csp-plant-online-by-years-end/
  19. "Tonopah Solar Energy files for bankruptcy"
    https://pvtimes.com/news/tonopah-solar-energy-files-for-bankruptcy-87661/
  20. "Del. Court Confirms $1B Nev. Solar Plant's Ch. 11 Plan - Law360"
    https://www.law360.com/bankruptcy/articles/1334384/del-court-confirms-1b-nev-solar-plant-s-ch-11-plan
  21. KLAS
    https://www.8newsnow.com/news/local-news/solar-plant-near-tonopah-producing-power-for-nv-energy-after-stop-during-bankruptcy/
  22. Bloomberg
    https://www.bloomberg.com/news/articles/2020-01-06/a-1-billion-solar-plant-was-obsolete-before-it-ever-went-online
  23. www.cmbeb5visa.com
    https://web.archive.org/web/20170328195137/https://www.cmbeb5visa.com/project/group-ix-crescent-dunes-solar-reserve/
  24. www.cmbeb5visa.com
    https://web.archive.org/web/20170328020133/https://www.cmbeb5visa.com/project/group-xi-crescent-dunes-acs-cobra/
  25. Las Vegas Review-Journal
    http://www.lvrj.com/news/nevada-solar-project-to-get-737-million-federal-loan-guarantee-130713818.html
  26. Power Technology
    https://www.power-technology.com/projects/crescent-dunes-solar-energy-project-nevada/
  27. "Crescent Dunes Solar Energy Project"
    http://www.nrel.gov/csp/solarpaces/project_detail.cfm/projectID=60
  28. "Nevada solar plant back online after eight-month outage"
    https://www.reviewjournal.com/business/energy/nevada-solar-plant-back-online-after-eight-month-outage/
  29. pv magazine USA
    https://pv-magazine-usa.com/2019/10/07/will-doe-take-the-crescent-dunes-solar-project-into-bankruptcy/
  30. SOLARRESERVE CSP HOLDINGS vs.TONOPAH SOLAR ENERGY, LLC - Docket No.2019-0791
    https://www.bloomberglaw.com/public/desktop/document/SolarReserveCSPHoldingsLLCvsTonopahSolarEnergyLLCDocketNo20190791?1570209807
  31. "Tonopah solar project part of $200M settlement | Las Vegas Review-Journal"
    https://www.reviewjournal.com/news/politics-and-government/200m-settlement-announced-over-bankrupt-tonopah-solar-project-2084328/
  32. Wall Street Journal
    https://www.wsj.com/articles/energy-department-poised-to-lose-up-to-225-million-on-solar-project-bankruptcy-11596145244
  33. "POLITICO Pro"
    https://www.eenews.net/stories/1063659143
  34. CSP Today Business Intelligence
    http://analysis.newenergyupdate.com/csp-today/markets/no-drama-solarreserve-commissions-worlds-largest-csp-tower-storage
  35. www.solarpaces.org
    https://www.solarpaces.org/vast-solar-has-a-fix-for-crescent-dunes-thermal-storage-tank-leak/
  36. RenewEconomy
    https://reneweconomy.com.au/solarreserve-still-falling-short-at-flagship-solar-tower-project-13928/
  37. Electricity Data Browser
    https://www.eia.gov/electricity/data/browser/#/plant/57275/?pin=ELEC.PLANT.GEN.57275-SUN-ALL.M&linechart=ELEC.PLANT.GEN.57275-SUN-ALL.M
  38. www.solarpaces.org
    https://web.archive.org/web/20211219113434/https://www.solarpaces.org/eurotrough-cut-ramp-up-in-china-100-mw-urat-csp%E2%80%A8
  39. HELIOSCSP
    https://helioscsp.com/salt-leak-shuts-down-crescent-dunes-concentrated-solar-power-plant/
  40. Bloomberg
    https://www.bloomberg.com/news/articles/2020-01-06/a-1-billion-solar-plant-was-obsolete-before-it-ever-went-online
  41. "Comparing the Costs of Intermittent and Dispatchable Electricity Generating Technologies"
    https://www.researchgate.net/publication/227357598
  42. "MIT Economics"
    https://web.archive.org/web/20210221202324/http://economics.mit.edu/files/6317
Image
Source:
Tip: Wheel or +/− to zoom, drag to pan, Esc to close.